East Asia

time: 2023-11-29

 

 


Project information  Product information 
• Capacity • 500kW/1MWh • 250KW PCS*2+700KW solar panels+1MWH BYD LFP battery
• PV • 700kwp  • Output power 500KW
• Position • East Asia • Support 20*6 MPPT
• On grid time • 2023.11 • CE, TUV, SAA, NRS certification
• Application  • on/off grid, emergency power  supply