Hunan

time: 2022-09-10

 


Project information  Product information 
• Capacity • 100MW/200MWh • SNE-630K-CP Energy storage converter (without isolation transformer)
• Position  • Shaoyang, Hunan • Rated power 630kW
• On grid time •  2021.05 • Maximum efficiency 98.7%
• Application   •  Grid-side peak shaving and frequency modulation • CE, CGC, TUV, l1hvrt certification